DCC-10-PCB-40A is the electronic infrastructure that fits inside the DCC-10-BOX and allows the connection of an EV charger to the main feeder of a panel without affecting the load calculation.
OPERATION
- Once connected inside the DCC-10-BOX, it works as a DCC-10: DCC does a real-time reading of the total power consumption of a home or condo electrical panel;
- It detects when the total power consumption of the main circuit breaker exceeds 80% and temporarily de-energizes the charger.
- When DCC detects that the total power consumption of the electrical panel is less than 80% for more than 15 minutes it automatically re-energizes the charger.
- DCC will only allow power to be delivered to the EV charger if the total demand of the panel is below its full capacity.
COMPATIBILITY
- DCC-10-BOX
FEATURES
- Components needed to connect and power an EV charger.
Gen-3 of the DCC-10 has the ability to receive and transmit load shedding instructions from an external energy management system via a dry contact input and output.
Download the DCC-10 Specification Sheet
Download the DCC-10 Installation Manual
INSTALLATION VIDEO