Special Pricing Available to Licensed Electricians

DCC-9-40A-3R | EV Energy Management System | Splitter Box 120/240-208V, Max 125A, 40A Breaker included, NEMA 3R Enclosure
DCC-9-40A-3R | EV Energy Management System | Splitter Box 120/240-208V, Max 125A, 40A Breaker included, NEMA 3R Enclosure
DCC-9-40A-3R | EV Energy Management System | Splitter Box 120/240-208V, Max 125A, 40A Breaker included, NEMA 3R Enclosure
DCC-9-40A-3R | EV Energy Management System | Splitter Box 120/240-208V, Max 125A, 40A Breaker included, NEMA 3R Enclosure
DCC-9-40A-3R | EV Energy Management System | Splitter Box 120/240-208V, Max 125A, 40A Breaker included, NEMA 3R Enclosure

DCC-9-40A-3R | EV Energy Management System | Splitter Box 120/240-208V, Max 125A, 40A Breaker included, NEMA 3R Enclosure

Regular price
$1,215.00
Sale price
$1,215.00
Shipping calculated at checkout.
Quantity must be 1 or more

DCC-9 is an EV Energy Management System, specifically designed to allow the connection of a charger to the main feeder of a panel without affecting the load calculation.

This unit is designed for an exterior installation.

DCC-9 is proudly manufactured in Canada by Thermolec.


OPERATION

    • Real-time reading of the total power consumption of a panel with pre-wired current transformers (CT)
    • Detects when the total power consumption exceeds 80% of a main circuit breaker capacity and temporarily de-energizes the charger
    • Automatically re-energizes the charger when the total power consumption of the main circuit breaker capacity is less than 80% for more than 15 minutes

FEATURES

    • Ideal for when no additional breaker slots are available in a panel
    • Does not affect the load calculation of a panel
    • Automatic utility billing of electricity consumer (particularly important for condo installations)
    • Can be mounted on the wall or ceiling

Gen-3 of the DCC-9 has the ability to receive and transmit load shedding instructions from an external energy management system via a dry contact input and output.

Included: Charge Controller, Splitter box (Max 125A), EV Charger Breaker (Max 60A) and pre-wired current transformers (CT).

DCC-9 Spec Sheet Download the Technical Specifications

DCC-9 Spec Sheet Download the Installation Manual

    INSTALLATION VIDEO